Elettronica Plus

TDK-Lambda: £11.5m investment to redevelop manufacturing facility in IlfracombeERT

TDK Corporation announces an £11.5m investment package to redevelop its TDK-Lambda manufacturing facility in Ilfracombe, UK.

The investment, which will be staged over the next three and a half years, will enable the company to increase production capacity by 50%.

The original factory was built over 50 years ago with further expansion in the mid-1980s. While the company has invested heavily in new equipment and building upgrades over these years, including the addition of a £1 million EMC Centre in 2019, it is now time to redevelop the site.

The redevelopment will increase manufacturing space, expand the R&D facilities, and radically overhaul and automate the end-to-end material flow.

The redevelopment programme will be split up into a four-stage process to ensure continuity of production and services. Stage one will be the construction of new offices, including employees’ facilities and a health and fitness centre, on the North and West faces. Upon completion, the South facing office will be extended to expand the R&D, product verification & test, and manufacturing engineering facilities. The link area between the two factory buildings will then be infilled, and Smart, Lean storage facilities and AGVs for material handling installed. Finally, the manufacturing areas will be reconfigured with designated Front End (PCB assembly) and Back End (configuration & test) production areas.